INQUIP Associates, Inc., a speciality geotechnical contractor, traces its roots back to the beginning of the slurry trench technology in 1950 on the Terminal Island Project. This was the first trench ever excavated under bentonite slurry for an industrial application. The company was founded in 1977 to continue and further develop the activity of the groundwater control division of Industrial Engineering and Equipment Corporation, founded by Mr. Charles H. Toll, one of the pioneers in the development of the slurry trench method. Mr. Toll was instrumental in the promotion and construction of economical underground seepage barriers, including the Terminal Island Project.

INQUIP's main activity from its creation to the early eighties was related to the installation of soil-bentonite cutoff barriers and liners. In order to utilize the wide experience of its management team and to be able to satisfy more efficiently the needs of its clients, INQUIP expanded its product line to other geotechnical services. This carefully controlled growth process is expected to continue in the future. Many of the speciality techniques offered by INQUIP have applications for the control and mitigation of pollution associated with landfills and waste management facilities.

INQUIP offers capabilities for the installation of:

All types of underground seepage barriers
Cast-in-place or precast slurry walls for support of excavations
Deep soil mixing
Leachate collection systems
Liners
Pressure and jet grouting

INQUIP has experience with federal and state regulations governing health and safety for remediation work on the hazardous and toxic sites.

INQUIP's major goal is to provide excellent service to its clients and to maintain a high level of quality construction. Only qualified, technically capable field managers oversee site construction. The company management strongly believes that close understanding and cooperation with the owner and the engineer are essential in resolving technical difficulties and achieving high performance. INQUIP looks forward to working closely with its clients for the successful completion of their projects.

Slurry Trench Method of Excavation

Bentonite slurry has been used to stabilize trenches under excavation since 1950. This technique, referred to as the slurry trench method, has enabled excavation of deep, narrow vertical trenches in soils which cannot otherwise stand unsupported without using shoring and/or dewatering, and particularly in soils beneath the groundwater table. During excavation, the vertical walls are supported by keeping the trench filled with bentonite slurry. The hydrostatic thrust of the slurry is the primary stabilizing force supporting the saturated soils. Slurry fabricated with biodegradable polymers instead of bentonite has been used to stabilize trenches for specific applications.

The slurry trench method of excavation is used for the following types of construction:

Soil-bentonite (S-B) cutoff walls
Soil-cement-bentonite (S-C-B) cutoff walls
Cement-bentonite (C-B) cutoff walls
Cast-in-place concrete slurry walls
Precast concrete slurry walls
Bio-polymer (B-P) drainage or recharge trenches

INQUIP specializes in construction using all of the above techniques throughout the United States and Canada, and occasionally internationally, both as a contractor and subcontractor. In some cases INQUIP works directly with the general contractor, owner or engineer by providing expertise and specialized equipment.

INQUIP is available to discuss your project and to supply for your consideration specific application information and budget costs. Please contact any of our regional offices for more details.

Pollution Control Projects

INQUIP has considerable experience working on hazardous and toxic waste sites. These projects either involve the remediation or closure of the sites and may use one or more of our specialty geotechnical techniques. Slurry cutoff walls are often used to contain contaminated groundwater and prevent the horizontal migration of leachates, or prevent the infiltration clean groundwater. Collection/extraction trenches constructed by the Bio-Polymer technique are used to collect and extract leachate. Other INQUIP techniques such as grouting, HDPE curtain walls, and stabilization have also been successful used to contain pollution.

Proper planning and engineering are a requirement on all pollution containment projects. The chemistry of the leachate may effect the cutoff wall backfill mix and the bentonite slurry and these are normally tested prior to construction for compatilility. Groundwater flow may change after the installation of a slurry wall, so groundwater modeling is often used to evaluate groundwater control schemes. With proper planning, containment is often the most economical and lowest risk approach for pollution control.

Combinations of geotechnical techniques are commonly used to minimize costs and optimize the construction of a pollution containment. The combination of a slurry cutoff wall with groundwater wells or collection trenches, capped with a barrier membrane, is often the most acceptable and economical method for groundwater containment. When space is limited, groundwater barriers and extraction can be combined in a single trench fitted with a HDPE curtain wall, aggregate, and extraction wells or piping. On difficult sites, problem soils or sludges may be stabilized to reduce the generation of leachates, and then contained with a slurry cutoff wall and less extensive groundwater controls.

INQUIP specializes in creating innovative and cost effective systems and combinations of techniques for pollution containment.

INQUIP is available to discuss your project and to provide for your consideration specific constructability information and budget costs. Please contact any of our regional offices for moreinformation.

Soil-Bentonite Cutoff Wall

Soil-Bentonite (S-B) cutoff walls are excavated in a continuous manner under bentonite slurry. The cutoff is keyed in most cases into an impervious stratum or bedrock. Impervious backfill is placed into the trench, displacing the slurry to form the completed cutoff. The backfill includes soils excavated from the trench and/or borrow materials. These materials are blended with slurry to yield a homogeneous mixture with a consistency corresponding to a 3 to 6 inch slump. The low permeability of the cutoff results primarily from the native clay in the backfill mixture. If not enough clay is present, bentonite is added to the mixture. Secondarily, low permeability results from the development of a bentonite "filter cake" on each wall of the trench and from slurry entering the voids of the formation adjacent to the trench.

A key factor in selecting the S-B cutoff over other alternate systems is economics. In many cases this method offers substantial savings over conventional systems such as sheet piling, grouting, clay core trenches, well points or reservoir liners. Sometimes the S-B cutoff is combined with other systems to obtain optimum efficiency. S-B cutoffs are most economical where excavation depth is in the range of standard construction equipment, such as backhoes (including those modified to reach depths in excess of 80 feet), and when the excavated material can be used to backfill the trench. They have proven to be effective seepage barriers. Permeabilities can be achieved from lxl0-6 to less than lxl0-7 cm per sec.

S-B cutoff walls have been used for many years as permanent cutoffs through and below dams and as temporary cutoffs to minimize the flow of groundwater into large excavations. They are also used for containment at hazardous and toxic waste sites to minimize the outward migration of leachate or the inflow of groundwater when leachate collection or extraction systems are provided as part of the remediation program.

Soil-Cement-Bentonite Cutoff Wall

Soil-Cement Bentonite (S-C-B) cutoff walls are a more recent development in slurry trenching technology. S-C-B cutoff walls attempt to combine low permeability of S-B cutoff walls in a material with a moderate strength. This technique may be advantageous on some sites since the trench soil may be reused in the backfill, thus minimizing disposal volume. S-C-B cutoff walls may be divided into at least three types: S-C-B cutoff walls, plastic concrete cutoff walls, and cutoff walls constructed by insitu soil mixing which incorporates bentonite and cement. S-C-B cutoff walls are generally shallow (less than 50 ft. deep) and constructed nearly identical to S-B cutoff walls but cement is added as well as bentonite to the soils. Normally native soils are mixed into the backfill and the typical permeability is in the 10-6 cm/sec range. S-C-B cutoff walls usually have an unconfined compressive strength (UCS) of 5 to 250 psi.

When deeper trenches are required, plastic concrete cutoffs may be the optimum choice for the slurry wall backfill. Plastic concrete is a weak concrete (UCS=500 to 1500 psi) with a small amount of bentonite, and may use sand and fly ash instead of soil for the base ingredient in the backfill. In deeper trenches, a more controllable and better engineered material is required to prevent the accumulation of sediments on the bottom of the trench and potentially windows at cold joints. Plastic concrete is often the material choice in very deep cutoff walls or in cases where some consolidation of the adjacent soils is expected after the cutoff wall installation. Plastic concrete cutoff walls are usually constructed in alternating panels so the joints can be excavated between panels to create a strong seal. Plastic concrete ingredients are usually mixed in a ready mix plant or other similar equipment that can carefully control proportions.

Deep soil mixed (DSM) cutoff walls typically use a mixture of cement and bentonite as admixtures. DSM walls have similar strength and permeability to S-C-B slurry walls. With DSM walls all ingredients must be added as a fluid so workability of the S-C-B grout is critical. The amount of admixture in DSM wall is also limited because of workability limitations of the grout. In DSM walls the grout also serves as drilling fluid and therefore, soil resistance and spoil generation are also related to workability.

The presence of cement creates strength, but also challenges. All S-C-B materials must be sampled during construction. Except for the plastic concrete, after setting up in the trench the materials are too soft to core drill and too hard to push sample without creating microscopic cracks in the sample and producing erroneous results. The potential for cold joints and windows is greater in S-C-B cutoff walls, and therefore quality control measures must be more exacting. Other ingredients may be used in place of cement or bentonite to create slightly different properties or reduce costs including: attapulgite clay, flyash, slag cement, gypsum, and many other similar materials.

INQUIP installed the largest to date S-C-B cutoff wall (725,000 square feet) in 1997 in California to control seepage through river levees.

Cement-Bentonite Cutoff Wall

Cement-Bentonite (C-B) slurry trench cutoff walls utilize a bentonite slurry containing cement to stabilize the trench during the excavation phase. After completion of the excavation, the cement causes the slurry to harden to a strength comparable to that of a stiff clay, thereby eliminating the need for trench backfilling. The cement-bentonite slurry contains no aggregate other than some suspended soil particles from the excavation process, The bentonite provides the media to keep the cement in suspension until initial set occurs.

Strength and plasticity of the hardened cement-bentonite slurry will vary, depending mostly on the cement/water ratio and the type of cement, with higher strengths having lower plasticity. Mixes can be designed to achieve unconfined compressive strength from 5 psi to well over 20 psi at 28 days.

Additives, including setting retarders, can be incorporated in the mixture to achieve certain operating characteristics, or for economy. For example, flyash is sometimes used as a filler to increase the density of the slurry and to reduce the cement content. The permeability of C-B cutoff walls depends on the proportions of bentonite, cement and flyash used in the mix. Permeability can normally be achieved in the range of 10-5 to 10-6 cm per sec. Lower permeabilities can be achieved if required.

Some of the primary reasons for selecting C-B cutoff walls instead of soil-bentonite cutoff walls are:

Design requirement for strength of the backfill.
Potential for trench instability due to soft and loose soil zones or adjacent surcharges.
The panel method of excavation can be employed where these conditions are critical.
Site conditions restricting the working area and preventing the preparation of the S-B backfill mixture alongside the trench.
Unavailable or costly materials suitable for soil-bentonite backfill.

INQUIP has experience in the installation of C-B cutoff walls since 1977, and has access to advances in mix technology through license agreements.

Concrete Slurry Walls

Concrete Slurry walls are slurry walls constructed to carry structural loading. These slurry walls are backfilled with steel reinforcing and concrete, and used as retaining walls, basement walls, or as the walls of tunnels especially when groundwater presents a problem for construction. There are at least two kinds of structural walls; diaphragm (or cast-in- place) walls and precast walls. Concrete slurry walls are usually excavated under bentonite slurry in alternating panels. The length of the panel depends on site conditions and the length of the excavating tool, typically a slurry clam bucket. In addition to excavating and backfilling, concrete slurry wall panel must be treated to ensure the integrity of the joints and the quality of the concreting operation.

Diaphragm walls are the most common concrete slurry walls. After excavating, the panels of a diaphragm wall must be "desanded" to remove excess sand that accumulates on the bottom or is suspended in the slurry. Next, prefabricated steel reinforcing or "rebar cages" are lowered to the panel. The rebar cages may also support future structural or utility connections using "knockouts" that are pre-set in the wall. Next, the panel is filled with a high slump concrete which is placed in the wall through tremie pipes, to prevent segregation of the wet concrete. After the primary panels are set, the secondary panels are created between the primary panels to complete the wall. Control of verticality and careful cleaning of the concrete is important to the quality of the seal between panels. Sometimes steel beams (soldier piles) are used to better reinforce the connection between the primary and secondary panels, this is referred to as the "soldier pile tremie concrete" (SPTC) method. The appearance of the completed wall is a direct reflection of the soil excavation. In some cases, the surface of the wall can be covered with paint or shotcrete for a better visual effect.

Precast concrete slurry walls are built utilizing precast concrete panels, either reinforced or prestressed, which are inserted into slurry filled trenches. The precast elements are usually placed in a special C-B slurry to seal the joints. When settlement is critical, the bottom of the precast panel can be set into tremie concrete. The main advantage of the precast walls is the ability to have an architectural appearance of the completed wall.

Concrete slurry walls are often used as the walls for a variety of deep excavations where the space is intended to be permanently useable. Sometimes concrete slurry walls are used to accelerate the construction of large buildings using the "top-down" construction approach where the basement and the upper floor are constructed simultaneously after a concrete slurry wall is installed to support the basic structure. Also, the "cover and cut" construction developed in Europe, has enabled construction of underground structures in congested areas in a more expedient and efficient manner. With this method, cast-in-place or precast slurry walls are placed as the perimeter finished walls of the underground structure. The top cover is then poured on grade, leaving access openings through which the mass excavation under the top cover and between the slurry walls is performed. This method can minimize the disturbance of traffic and other above ground activities. Such activities are restored while the remaining work takes place below the cover slab. Concrete slurry walls are also used to support bridge abutments and other structures which must carry vertical loadings and horizontal earth loads
.

Bio-Polymer Drain & Recharge Trenches

Bio-Polymer (B-P) trenches are installed for drainage, leachate collection, or recharge systems where in-the-dry installation methods are not feasible or where cost savings can be realized. B-P trenches differ from normal slurry trenches in two ways. First, the slurry used to support the trench walls during excavation is made from a biodegradable material such as guar gum or polymer. Second, the trench backfill is a pervious material such as permeable sand or drain rock. After completion of the backfill, the slurry filling the voids of the filter material is treated to allow it to biodegrade or break down. It is then flushed out of the granular material. Drains installed by the bio-polymer method are usually deeper than 15 to 20 feet and have achieved depths of nearly 70 feet. They are used when the groundwater or soil conditions would result in an unstable situation without a trench shoring system, or where contaminated groundwater exists. In the latter case, the B-P trench method eliminates the need for dewatering, thereby greatly reducing the necessity for costly treatment or disposal of contaminated water from dewatering operations.

The B-P methods have been used on numerous polluted sites to reduce the cost of remediation. B-P trenches have been used to install pump and treat systems, air sparging trenches, groundwater collection and reinjection galleries and groundwater barriers. B-P drains also have uses in civil engineering including applications such as toe or chimney drains for earthen dams, groundwater diversion trenches, and dewatering for slope stabilization.

The construction of complex drainage trenches (with multiple liners, pipes, and aggregate) can be made cost-effective with the Bio-Polymer trench technique, however there are a number of construction considerations which must be resolved. First, all structures placed in a B-P trench must be weighted to sink into place through the slurry. Standard manufacturer's recommendations are available for placing some types of pipes under water or slurry. Fabrics must be designed not to trap the polymer in its weave. In general needle punch fabrics are not recommended, whereas woven fabrics are better suited. HDPE liners can be placed in the trench using special frames, rollers, and other construction aids. However it is not possible to weld joints under the slurry. Often a complex design can be simplified by substituting well casings for manholes and flexible corrugated slotted drain pipe for rigid pipe.

A soil-bentonite or cement-bentonite cutoff wall can be used as a containment device in conjunction with a B-P drainage or recharge trench to eliminate the necessity of a HDPE liner in the B-P trench.

Reactive Barriers-Funnel and Gate®

Reactive Barriers are in-ground or insitu treatment systems that use specialty engineered media or bio-organisms to clean contaminated soil and groundwater. Reactive barriers can be permeable or impermeable and may use media such as iron filings, carbon, peat moss, and bacteria. Reactive barriers can be used to treat a variety of organic compounds and heavy metal contamination. The significant advantage of reactive barriers is that they can be effective without pumping, mass excavation of contaminated soil, above-ground treatment facilities or off site disposal. The installation of reactive materials can be subdivided into two categories: 1) one-time (buried) installations, and 2) replaceable (cassette) installations. The one-time installation is the case where the reactive media is simply buried in a trench. The primary design variable is the width of the reactive media and the volume required for the lifetime of the installation. Cassette installations require a permanent underground structure such as a slotted tank, large diameter manhole, or similar receiving structure. The cassette system anticipates changing the reactive media or using a sequential treatment system. Piping valves, and connections can be necessary with cassette systems so the installations are usually more complicated and costly.

The efficiency of reactive barrier installations can be significantly improved by controlling the flow of groundwater through the media. The funnel and gate installations often use slurry cutoff walls as wingwalls to funnel groundwater into a permeable reactive barrier or gate. Slurry cutoff walls can also be used to encircle contamination and permit a single vessel of permeable reactive media inside the containment to economically treat a controlled volume of groundwater. Special bacteria or high carbon fly ash can be added to the soil-bentonite slurry cutoff wall to create an impermeable reactive barrier.

The construction of reactive barriers for buried installations can be made more economical using proven slurry trench and soil mixing methods. For permeable reactive barriers, the Bio-polymer drain method can be used to install the media without the need for dewatering, sheeting or shoring. Injecting reactive media via soil mixing can treat soil contamination in one application without excavation or other invasive methods.

INQUIP installed the first commercial permeable reactive barrier in 1994. This funnel and gate used cement bentonite and soil cement bentonite slurry walls to funnel ground water through an iron filings gate on a congested industrial site in California. INQUIP also installed the first commercial impermeable reactive barrier in 1996. A soil- bentonite slurry wall was installed containing a high carbon fly ash additive in the backfill around a sludge landfill in Michigan.

Insitu Soil Mixing

Insitu soil mixing is a geotechnical technique that has numerous cost effective applications for civil/infrastructure projects and environmental remediation. Typically, large mixing augers (3 to 12 ft. diameter or more) or modified excavator tools are used to mix soil or sludge with a cement grout or other reagents to improve their properties or treat buried contamination. Insitu soil mixing has the significant advantage of soil treatment without excavation, dewatering or shoring. Soil mixing has the capability to go to depths greater than 10 feet. Insitu soil stabilization has been used to build retaining walls, cutoff walls, and other foundation systems. Insitu treatments can be used to volatilize or oxidize contaminants, stabilize sludges, mix and inject biological or reactive media and to implement a wide variety of other insitu treatments.

The design of insitu soil mixing projects requires a comprehensive understanding of the site conditions and the goals of the construction. Usually a pre-construction laboratory testing program is enacted to establish performance criteria, material requirements and budget cost. The testing may be used to determine workability, volume increase, strength, permeability, leachate chemistry, or biological characteristics of the treated soils. A pilot program, or field test can also be implemented, if required, to better determine the specifics of the project. A well designed laboratory performance and/or pilot program will usually provide an accurate prediction of project performance.

INQUIP was one of the first contractors to use modified caisson-type equipment (12 ft. diameter) for soil stabilization. INQUIP has also used modified excavators to stabilize soft soils and wastes. This line of work has been a natural extension of our normal slurry trench work of mixing soils and grout. Our staff has been involved in many of the largest and innovative soil mixing projects including combinations of soil mixing with soil vapor extraction, zero valent metals, and biological agents. New concepts in soil mixing include the use of special soil mixing patterns, combinations of soil mixing with slurry cutoff walls and special mixing patterns to create a composite soil structure for retaining walls and foundations.

Soil mixing is an extremely flexible geotechnical technique which has a variety of applications for contaminated soil treatment, as well as for soil improvement. Insitu soil mixing continues to evolve and suggest new methods for soil improvement and treatments.

If you have an immediate or future application for any of our specialty construction techniques, please contact us. If you need additional information please e-mail us at: info@inquip.com, or call one of our offices.

Eastern Region: P.O. Box 6277, Mclean, VA 22106
TEL: (703) 442-0143, FAX: (703) 442-0188

Western Region: P.O.Box 2182 , Santa Barbara, CA 93120
TEL: (805) 687-2007, FAX: (805) 682-0396

Southern Region: 17816 Lee Ave., Redington Shores, FL 33708
TEL/FAX: (727) 395-9690